The Noon Patrol Builders Report

January 2002

Click on small picture to view large version.




Number 001 is together and ready for rigging.


String used to help align the wings also makes a good clothesline.


The roundels look great.


A few more of those great looking roundels.


The first throttle lever.


The bellcrank used between the throttle cable and the carb throttle link.


Installing fire shields on the hole in the firewall.


Prototype baffling.


Another view.


Burnishing the baffling.


The results.


Even a broken foot can't stop Jerry.


Prototype baffling inside the cowl.


Engine baffling with seal installed on one side.


Closeup of the baffling seal.


The exhaust pipes flanges were slightly warped when they were welded.


The exhaust pipes flanges were dressed so will they seal well.


Checking the wing dehedral.


Gauge for checking the dehedral.


A pile of half done upper wings.


Upper wings are still being constructed.


Upper wing assembly.


Upper wing ready for cover.


Tape applied to possible wear points on fuselage.


Swaging cable ends onto the cable.


Closeup of swaging.


Cable tester. Weights are hung on this lever.


This cable tester will be used to test each cable fitting to 60% of it's rated load, per AC 43.13.


The Pirelli motorcycle tires recommended by the Kansas City Dawn Patrol replace the wimpy original tires that came with our wheels.


Assembling the axle.


Some hangar maintenance.


Chapter 292 Home page