The Noon Patrol Builders Report

February 2002

Click on small picture to view large version.




Tensioning the upper wing diagonal cables prior to crimping the cable.


The team is about to complete the final upper wing. A celebration was held after this milestone.


The first firewall forward is complete.


The engine has been installed on the second aircraft.


Tailwheel steering cable being installed.


Aircleaner housings being fabricated.


More small parts.


Mounting the Pirelli tires on the rims.


Instrument panel and wiring setup.


Wiring diagram.


Preparing to paint roundels on a set of wings. The white has been applied and now the masking is done for the blue and the red.


The masking takes ten times more than the actual painting. Doyles wife Susie helps with this demanding task or it would take twenty times more.


Spraying the blue.


Turning the wing over to paint the other side.


Spraying the red.


The Noon Patrol has rented one of the attached hangars from the EAA Chapter so we don't have to store parts in many hangars all over the place.


Noon Patol members admiring all the space in our Hangar. Against the wall are some completed wings showing the beautiful roundels.


It won't take long to fill up the empty hangar.


Aircraft parts.


Some completed fuselages lined up.


Damn! The wingspan is greater than the door width. We can't get the completed Nieuport out of the shop.


Chapter 292 Home page