 |
Checking out the Nieuport 11
plans.
|
 |
Starting to build a rudder jig.
|
 |
Pouring lead shot into the tubing
prior to bending.
|
 |
Bending the tubing for the rudder.
|
 |
The outer tube in place in the
rudder jig.
|
 |
Preparing the vertical post for
the rudder.
|
 |
Fitting the post into the rudder
jig.
|
 |
Our first rudder ready to be
riveted.
|
 |
The duct tape is temporary -
really!
|
 |
Starting the horizontal stab jig.
|
 |
14 horizontal stabs stored and
waiting for the next step.
|
 |
Elevator jig under construction.
|
 |
Rudder and Elevator horns ready
and waiting.
|
 |
The tube notcher under
development.
|