The Noon Patrol Builders Report

August 2002

Click on small picture to view large version.




The drawing.


Owner-builders randomly selected which aircraft they'll own.


Moving partially completed aircraft outside so there's room in the hangar for the monthly chapter meeting.


The aircraft wait outside during the chapter meeting.


Nieuports patiently waiting for completion.


Installing an engine.


Tightening the engine mount bolts.


Pile of engines remaining to be installed.


New battery box.


Our CG was too far forward. Relocating battery to behind seat required our slimmest member.


Cabanes painted to look like wood.


Checking the lower wing for correct incidence as the V-strut is attached.


How upper wing incidence is measured while rigging.


Checking upper wing incidence.


An instrument panel painted to look like wood.


Engine running on test stad.


It makes a lot of wind.


A LOT of wind.


Adjusting the carb between tests.


Test stand instrument panel.


EGT gauges installed just for this test.


Chapter 292 Home page