The Noon Patrol Builders Report


February 2000.

Click on small picture to view large version.

So far we've raised over 35 cents.
Rudder bars being sanded.
Rudder bars being finished.
The gussett bending tool in use.
Details of how fuselage side tubes fit together before the gusset plates are installed.
Marking a fuselage side gussett plate for drilling.
This one has had some of the holes drilled and is clecoed into place while the rest are drilled.
The team takes a break after completing the final fuselage side.
Here are 14 completed left fuselage sides. The 14 completed right sides are at the other end of the hangar.
We've ordered the parts for one VW based engine so we can assemble it and mount it to do our weight and balance tests. Here're the cases.
How the starter mounts to the Diehl case.
The Diehl case mounted on our prototype firewall.
This bolt fits into this sleeve.
Pressing the bolt into the sleeve.
The fit inside the sleeve keeps the bolt from turning.
When it's done it looks like this.
Landing gear struts completed and ready to be installed.
A wheel and drum brake assembly.
Building the seats.
Wood plugs for stiffening the wing struts.
A plug is driven into the center of the wing strut.
A jig is being built to hold the two fuselage sides to be be assembled into one unit.
The two fuselage sides are being assembled into one unit in this jig.

Chapter 292 Home page